At the end of August, residents of Atbasar, who were left without housing as a result of the flood, will move to new apartments

2355
Adyrna.kz Telegram

In the city, two 100-square-meter residential buildings are in the final stage of construction, and a third house is being built. It became known during the working trip of mayor of Akmola region Marat Akhmetzhanov to Atbasarsky and Yesilsky districts.

Construction crews of the contractor company "MEDINA Building" LLP are completing the improvement of the territory and the final preparations for putting the house into operation. According to Amanbek Kalzhanov, the mayor of Atbasar district, utility networks have already been connected to the third house under construction, and it is being connected to heat, water and electricity supply. The builders are raising the fourth floor of the future 9th floor.

Реклама
  • ИП Попов А.П.
  • ИНН: 602715631406
1 чайная ложка на ночь и все - потенция сильнее, чем в 20 лет
Реклама
  • ИП Попов А.П.
  • ИНН: 602715631406
Видео с выпускного "убило" всех родителей: кто это заснял?!
Реклама
  • ИП Попов А.П.
  • ИНН: 602715631406
Школьники потрясли всю сеть этим танцем — смотреть без детей!
Пікірлер